WHAT SETS US APART
Our Process
We've developed a proven process that helps brands, developers, and franchise groups move from concept to completion faster. By combining in-house design expertise, state-of-the-art manufacturing technology, and rapid installation, we eliminate many of the delays and inefficiencies associated with traditional construction. Our automated production equipment improves precision, consistency, and material utilization, including lumber cutting technology that reduces waste to approximately 1% per lumber package.
​
The result? Greater predictability, improved quality, and a faster path to opening your doors.
Explore how our three-stage process, Design, Build, and Install, works together to streamline every phase of your project and help you get to business faster.

1. Design
Our team of in-house design engineers reviews your plans and translates them into a prefabricated building system optimized for speed, precision, and scalability. We align your architectural vision with proven construction methods to streamline fabrication and installation without sacrificing design integrity.
​
Through our value engineering process, we help:
-
Identify cost-saving opportunities
-
Reduce material waste
-
Eliminate unnecessary complexity
-
Improve project predictability
-
Accelerate manufacturing and installation timelines
The result is a build-ready design package that keeps your project moving efficiently from planning to construction.​
2. Build
Inside our 136,000 sq. ft. manufacturing facility in Worthington, MN, your building is constructed in a climate-controlled environment to help reduce weather delays, maintain consistent quality, and keep your project on schedule.
​
Our integrated manufacturing process provides:
-
Precision-built components
-
Improved coordination from start to finish
-
Consistent quality control
-
Experienced, skilled labor teams
-
Reduced construction delays
Throughout production, third-party inspections verify quality at critical stages, giving you confidence that your building is being constructed to meet rigorous standards.

_JPG.jpg)
3. Install
Installation is where prefabrication delivers some of its biggest advantages. Designed for speed and efficiency, most building shells are erected in as little as 5 days and fully dried-in within 1-2 weeks.
​
Benefits of accelerated installation include:
-
Reduced on-site construction time
-
Lower labor and equipment costs
-
Fewer weather-related delays
-
Reduced construction loan carrying costs
-
Faster occupancy and ROI
Whether you have a preferred general contractor or need assistance identifying the right construction partner, we make the process easy. Fullerton works collaboratively with your project team to ensure everyone is aligned before installation begins.
​
Our network of trained subcontractors works alongside a dedicated Fullerton Site Technician who oversees installation, maintains quality, and keeps the project on track from start to finish. The result is a streamlined construction process with fewer trades on-site, fewer opportunities for delays, and a faster path to opening your doors.
The Results
3-7
Days for typical shell installation
99%
on-time delivery rate
4000+
Buildings delivered nationwide
49
Number of states built in
64
Years as a prefab design-builder

1-Year Warranty
Every Fullerton project is backed by a one-year craftsmanship warranty, ensuring your building is delivered to the highest standards. In addition, all exterior finishes are covered by their respective manufacturer warranties for added peace of mind.