Accelerated Opening

the need for speed

Wood-framed/load-bearing panels are engineered to ensure fewer delays, thereby reducing construction time. Typical small commercial construction projects can be completed within five days. The accelerated on-site installation process:

  • Sets the pace for other trades
  • Minimizes set-backs caused by inclement weather
  • Mobilizes other sub-trades sooner.

 

 

site map        request information